The buildings “Responsible Person” (RP) is required to maintain the system to BS 9990:2006 – Code of practice for non-automatic fire fighting systems in buildings, and ensure maintenance frequency and procedures are in accordance with BS 9999:2008 – Code of practice for fire safety in the design, management and use of buildings, or as specified by the buildings Fire Risk Assessment (FRA).
BS 9990:2006 requires the system to undergo an annual static pressure test and inspection and a six monthly visual inspection, by a competent person. Thus ensuring the Dry riser system is maintained and functioning correctly for the fire brigade at all times. |